Project Overview

Generating steps from natural language does not mean a task has been completed. We turn task intent into an inspectable plan, execute it in simulation, and replay failed steps. Acceptance considers goal completion, permission boundaries, and human review together.

Last updated: 2026-10-13 · New Horizon Digital Outsourcing Team

Scenario Highlights

  1. 01Task and Tool Contracts
  2. 02Simulation Execution Interface
  3. 03Task Evaluation Examples

Deliverables

  1. 01Task and Tool Contracts
  2. 02Simulation Execution Interface
  3. 03Task Evaluation Examples
  4. 04Planning and Execution Logs

Path

Implementation Path

  1. 01 Confirm Inputs and Scope
  2. 02 Implement Models and Interfaces
  3. 03 Integrate and Evaluate Scenarios
  4. 04 Hand Over the Project and Evidence

Natural-Language Task Planning and Execution Validation in Simulation

01

Project Background

Tasks involving mobile robots and inspection drones are well suited to initial simulation checks of whether an agent understands the goal and invokes the correct actions. We also retain failure cases involving ambiguous instructions, unit errors, and unauthorized actions, without presenting code generation as production-grade reliability.

Robot arm task execution scene.
Robot arm task execution scene.

02

Technical Approach

Scene objects, permitted actions, and task constraints are provided to the planning layer, while a controlled execution layer checks parameters and permissions. Natural-language goals are first converted into evaluable conditions; generated code is not sent directly to physical equipment.

Task training and execution replay interface.
Task training and execution replay interface.

03

Implementation Process

Start with fixed objects and a limited task scope, including normal instructions, ambiguous instructions, and unexecutable tasks. Check each plan for nonexistent objects, incorrect units, and unauthorized actions. Retain execution traces and tool responses for replay-based analysis instead of masking failures by only changing prompts.

04

Deliverables

Deliverables include task and tool contracts, simulation execution interfaces, task evaluation examples, and planning and execution logs. Each identifies its version, inputs, operating environment, and corresponding acceptance steps.

05

Acceptance Approach

Acceptance focuses on goal completion, error handling, and permission boundaries. Model-generated plans still require verification. External model services, invocation costs, and the scope of data processing are specified at handover.

06

Implementation Outcomes

Make task-planning errors traceable.

The path from task intent to a testable prototype is shortened, and failed steps can be located through replay instead of seeing only a completion message.

Evaluation compares first-pass results, the number of human revisions, and troubleshooting time on a fixed task set, with safety-constraint violations recorded separately.

Turn Business Goals into a Project Plan with Clear Acceptance Criteria

Start with task objectives, available materials, and key constraints to define the questions to verify, assets to deliver, and acceptance methods for this phase.