Which projects fit?
For electromechanical and thermal systems, control plant models and component libraries, especially parameter studies and cross-tool integration.
Modelica
Develop coupled systems, including electromechanical–thermal systems, into reusable, simulation-ready component assets.
Modelica delivery includes component models, parameter provenance, initialization, reference scenarios and reproduction instructions. New Horizon checks physical connections and responses from components to systems; FMI work verifies variables, events and communication steps in the agreed receiving tool.
Last updated: 2026-10-13 · New Horizon Digital Outsourcing Team
View delivery and acceptance detailsModeling deliverables focus on models and integration testing notes. Complete simulation reports can be delivered in combination with Simulation Services.
Other Capabilities in This Domain
Explore implementation guides and case studies to understand input requirements, technical approaches, delivered assets, and methods for evaluating outcomes.
Engineering delivery brief
For electromechanical and thermal systems, control plant models and component libraries, especially parameter studies and cross-tool integration.
Provide topology, component values and units, drives and loads, initial states, measured traces and tool/library licenses. Distinguish design analysis from real-time integration.
Missing parameters require calibration or explicit assumptions. Successful FMU export does not establish universal compatibility, and offline runtime does not prove real-time capability.
Component complexity, initialization, switching events, external libraries and receiving tools affect duration. Validate a minimal co-simulation loop before scaling.
Acceptance Evidence
Check connections, units, initialization and parameter dependencies; record simplifications.
Acceptance Evidence
Compare reference traces under identical inputs and sampling, specifying error calculation.
Acceptance Evidence
Verify export type, platform, variable mappings, events and communication-step sensitivity.
Related case study
Design a software virtual commissioning workflow and subsequent real-time signal integration around vehicle climate-control requirements, state machines and parameter relationships.
Read the full case studyRelated standards and technical documentation for solution selection and implementation.
Describe your stage objectives and constraints (without classified details), and we will provide scope recommendations and a deliverables list.